- 2 x Covered spectator grandstands
- 1 x Two-row small spectator grandstand
- 1 x Accessible viewing platform
One benefit that the club saw almost right away was the ability to offer more tickets to visiting fans. This increased the typical away allocation by around fifty percent. As a result of the 890-seats being added at Holker Street, supporters around the ground benefit from upgraded facilities and improved sightlines.
The success of this project was largely down to the fantastic communication between the club and Stadia by GL events. As a result, the club succeeded in delivering its largest infrastructure project for around 30 years, without compromising safety or quality.
Frazer Stewart of Barrow AFC commented, “We spoke with many possible suppliers and went through a huge range of design options. There were three main reasons we chose Stadia by GL events.
“The lightweight design, which removed the requirement for piling foundations. The speed of installation, as they were the only supplier that could guarantee readiness for the start of the season. And their absolute professionalism.
“Everybody we dealt with was extremely knowledgeable, and helpful. The team were solutions based and more than willing to work through any problems.“