Aston Villa FC
Aston Villa Football Club appointed Stadia by GL events to deliver an extensive programme of stadium redevelopment works at Villa Park.
| Client | Aston Villa FC |
|---|---|
| Location | Villa Park, Birmingham |
| Scope | Major multi-phase stadium redevelopment and seating upgrades |
The Brief
Aston Villa Football Club appointed Stadia by GL events to deliver an extensive programme of stadium redevelopment works at Villa Park. What began as a seating replacement and safe standing project developed into a multidisciplinary, three-phase programme of works spanning the North Stand, Holte End, Doug Ellis Stand, Trinity Stand and the stadium’s southeast and southwest corners.
Acting as principal contractor and principal designer throughout the programme, Stadia by GL events delivered structural alterations, concrete terracing, seating installation, accessibility improvements, internal fit-out, hospitality expansion and operational infrastructure within a live Premier League stadium.
2024 Phase 1: North Stand and Holte End redevelopment
The first phase focused on the redevelopment of spectator areas within the North Stand and the upper and lower tiers of the Holte End. In the North Stand, existing concrete terracing was removed and reconfigured to accommodate new general admission seating and safe standing rail seats.
New crowd barriers were installed, alongside wider refurbishment works to modernise and enhance the spectator environment and improve safety.
Works to the Holte End included the removal and replacement of concrete terracing across both the upper and lower tiers. New precast concrete terrace units were installed, followed by new seating, glazed barriers and steel handrails.
This initial phase established an integrated approach combining structural stadium construction with specialist seating installation. It also demonstrated how existing stands could be reconfigured to enhance capacity, safety and spectator experience without requiring their complete reconstruction.
2025 Phase 2: Doug Ellis Stand, Trinity Stand and Event Control Centre,
Phase 2 significantly expanded the scope of the programme, incorporating structural modifications, additional terracing, seating replacement, accessibility upgrades and a complex internal fit-out.
At the front of the Doug Ellis Stand, the existing area was excavated to enable the installation of new foundations and drainage infrastructure. The concrete terracing was then extended by three rows, increasing the spectator accommodation. The existing terrace configuration was altered and new precast concrete elements were installed. Two accessible seating bays were created at either side of the terrace, complemented by new modern glazed barriers and spectator seating. In the upper tier, the existing general admission seating was removed and replaced as part of a comprehensive seating refresh.
Works within the Trinity Stand included the reconfiguration of existing concrete terracing and the installation of further new, high quality seating and glazed safety barriers, providing visual consistency between the stands.
A major element of Phase 2 was the creation of a new Event Control Centre within the Doug Ellis Stand. The internal fit-out included new partition walls and internal finishes, air conditioning and mechanical services and commercial kitchen facilities.
The event control room was designed to centralise key safety, security and communications functions within a purpose-built operational environment. Phase 2 also included the fit-out of accessible toilets at various locations around the stadium, improving the facilities available to disabled spectators in line with the green guide.
2026 Phase 3: Trinity Lower and southern corner redevelopment
Phase 3 brought together a broad package of structural, spectator, hospitality, media and operational improvements. The Trinity Lower stand was extensively reconfigured to improve the overall seating layout, circulation space and spectator facilities. Works included the refurbishment of fan terraces, new carpets and finishes in VIP spaces, upgraded turnstiles and associated infrastructure. Electrical containment, data services and connection infrastructure were incorporated into the installation, providing the technical foundation required for modern ,match day and event operations. The internal works extended into the Trinity concourse, where we delivered a new first aid room, additional toilets and a high-dependency accessible toilet. The package also included decoration and MEP.
Following the successful handover of the new Event Control Centre, the existing three-storey control building was removed during the season, while the stadium remained operational, making way for additional spectator capacity through a new viewing platform, a purpose-built DJ booth, a state-of-the art LED screen (size and spec detail if possible) and additional toilet facilities.
The specialist LED screen structure was developed in coordination with specialist screen provider ADI. Stadia by GL events designed and installed the primary steel support structure, secondary steelwork, access ladders and maintenance platforms. After the new LED screen was installed, the redundant screen in the southwest corner was removed and the area redeveloped to create additional capacity through a corner infill between the existing stands, increasing capacity by 616 seats, of 248 general admission, 11 accessible and 257 VIP seats.
Value engineering and efficiencies
Through a collaborative value engineering process, we were able to accelerate the programme by presenting an alternative construction methodology for the roof. Rather than assembling the roof traditionally at height, the steel frame was modularly assembled at ground level within the car park, reducing working at height risk before being craned into position. This approach reduced the construction programme by approximately eight weeks, enabling the club to use the new spectator accommodation sooner, generating additional revenue earlier than expected.
Key challenges and solutions
A central challenge across all three phases was the need to deliver major construction works while Villa Park remained operational. Stadium stands and spectator routes had to remain safe and operational, requiring close coordination with the club’s event, safety and facilities teams.
During the close season, temporary pitch protection was installed to provide access for cranes and heavy construction equipment. This allowed the most intensive structural works and lifting operations to be completed ahead of the new season.
The programme also had to accommodate other major events, including a large music concert, further reducing the available construction window and increasing the importance of detailed sequencing and programme control. Detailed temporary works and logistics strategies were developed for each construction area. Hoarding, controlled access gates, suitable for matchday spectator flow, in line with the Green guide were installed around the construction zone.
Maintaining the stadium’s safety certification was critical throughout the programme. Stadia by GL events engaged with the club, consultant team, local authority, Safety Advisory Group (SAG) and building control at key stages of design and construction.
Seating products deployed
Across the three phases, Stadia by GL events utilised our full spectrum of spectator seating products, including the GL – Vision TM, GL – Club, GL – VIP and GL – Exec
Let's Talk About Your Project
Whether you need replacement seating, a new stand, or expert guidance, our team is ready to help you find the right solution.
Follow Stadia
Explore our latest projects and stadium updates from Stadia by GL events.